Share
twitterlinkedinfacebook
Image 1 of 1
Wide view of the newly completed Austin IH-35 Illuminated Brontosaurus Bridge Makeover Project, bridging the gap between central downtown and East Austin.jpg
Fourteen curved and tapered galvanized steel poles will be supported under the freeway deck, and area lighting is attached along the undersides. Individually, the shape of the poles resembles a suspension bridge - re-associating the spot with connecting. Connecting land masses, across an interruption of the landscape, proposing the idea of separation and connecting at the same time. It is intended to be a gesture - a handshake under the freeway.
CONTACT

Email Facebook Twitter Pinterest Instagram YouTube

© 2016 Herron Stock LLC.