back to thumbnails

Downtown Austin I-35 Makeover Project & 6th Street Parking Lot - Stock Photo Images Gallery

Share
twitterlinkedinfacebook
Image 7 of 11
< Prev Next >
Wide view of the newly completed Austin IH-35 Illuminated Brontosaurus Bridge Makeover Project, bridging the gap between central downtown and East Austin.jpg
Fourteen curved and tapered galvanized steel poles will be supported under the freeway deck, and area lighting is attached along the undersides. Individually, the shape of the poles resembles a suspension bridge - re-associating the spot with connecting. Connecting land masses, across an interruption of the landscape, proposing the idea of separation and connecting at the same time. It is intended to be a gesture - a handshake under the freeway.
CONTACT

Twitter YouTube Pinterest Instagram Email

© 2019 Herron Stock LLC.